March 26, 2025
5 photo
Installed 1256 piles. A temporary drainage system has been installed to prevent the impact of rainfall. The excavation of the soil is continued, with 116,380 m³ of soil removed. We held a tender for construction work and signed a contract with the contractor, Westcon. They are currently carrying out preparatory work, including setting up a temporary office and installing equipment.