August 29, 2025
5 photo
In Building A5, column construction for the 4th floor in Zone 2 is ongoing, along with scaffold installation for the 3rd-floor slab in Zone 3. Foundation and structural works for the water storage tanks continue at Buildings A2.1 and A2.2. Pile installation for Building B8 has been completed at 28%. At Building A3.1, pile head trimming and foundation construction remain in progress.