Замовити дзвінок
0%

30 червня 2024 р.

6 фото
Dismantling of the second floor slab formwork and roof slab has begun. Installation of internal engineering systems (ventilation, air conditioning, electrical, and low-current networks) has also started. Work on the erection of internal walls has begun as well.