Work on laying the internal engineering networks in the building has continued, with internal rafters for air conditioner ducts installed and internal walls constructed. Work on the glass facade of the building has started (the installation of aluminum frames for the facade system completed). The installation of guides for internal glass walls has been completed, and floor screed has been poured on both floors of the building. Plastering of planter boxes on the building's facade has also begun.